Pavement Rehabilitation Projects

  1. 1 Street painting
  2. 2 Street with arrows
  3. 3 Stop painted on street
  4. 4 Curve painted onto the street
  5. 5 Overpass
  6. 6 Residential street
  7. 7 Residential street 2
  8. 8 Street with stop signs
  9. 9 On ramp
  10. 10 Crosswalk
  11. 11 Street
  12. 12 Merging lanes
  13. 13 Two lane street
  14. 14 Crosswalk from a distance

CIP899 - CalRecycle Project Acknowledgement

Funded by Grant from CalRecycle

7,002 California Waste Tires were diverted from the waste stream by this project

Cal Recycle